
To our General Contracting Partners:
At Linx Group, we understand that Division 06/12 is often the final piece of your project’s puzzle—and the one with the least room for error. We don’t just fabricate millwork; we manage the risk of the "final ten percent." By integrating Digital Twin coordination and Velocity Installation, we ensure that when our casework hits your site, it fits the first time—keeping your punch-list short and your substantial completion on track.
Why Linx Group
Schedule Certainty
Our 'Product-First' fabrication happens off-site, reducing on-site trade interference and compressing the installation schedule by weeks.
Pre-Coordinated Engineering
Every project is built as a "Digital Twin" first, allowing us to resolve hardware, lighting, and structural clashes before a single cut is made.
2mm Precision Standard:
We eliminate 'field-fit' excuses. Every unit is manufactured to a strict tolerance, ensuring perfect integration with MEP and existing site conditions.
Risk Mitigation
By locking in material costs and production slots early, we provide budget stability and a predictable delivery window for large-scale commercial scopes.
Submittal Excellence
Comprehensive CAD packages and material samples that streamline the RFI process and accelerate architect approval."
Velocity Installation
We deliver pre-engineered, "plug-and-play" assemblies that compress traditional on-site millwork installation timelines by weeks, not days.
Beyond the Bid
"How we protect your margin and your schedule from pre-con to punch-list."
Active Clash Detection
We identify MEP and structural conflicts in our Digital Twin before fabrication. This eliminates field-issued RFIs and emergency site-fixes.
Trade Integration
We coordinate the specific cutouts for electrical, plumbing, and medical gas. When our casework arrives, the other trades can finish their work immediately.
Material Price Locks
Once your bid is awarded, we lock in your material pricing and production slot. No "market escalation" surprises mid-project
Paperwork Speed
Our Submittal Packages are designed for "First-Pass Approval," keeping your project out of the architect’s pending folder.

please Find the necessary Documentation you need for immediate project onboarding. Access our W-9, COI, and a detailed Technical Scope outlining our core strengths in 2mm-precision casework and integrated specialties. These resources define our exact capabilities, ensuring your project meets Division 06/12 standards while eliminating scope gaps before fabrication begins.
compliance documents
Capability Statement
Linx Group LLC | Division 06 & 12 Specialized Contractor
Linx Group LLC provides high-precision architectural casework and technical millwork for large-scale commercial projects. We leverage Digital Twin engineering and off-site fabrication to eliminate field-fit errors and compress construction schedules.
Core Competencies
-
Division 06 40 00: Architectural Woodwork & Custom Casework.
-
Division 12 30 00: Institutional & Commercial Casework.
-
Technical Integration: Seamless MEP, lighting, and hardware coordination.
-
Digital Twin Engineering: 100% pre-coordinated 3D modeling before fabrication.
-
Advanced Materials: Solid surface, high-pressure laminates, and specialty wood finishes.
SUBDIVISIONS
-
06 41 00 - Architectural Wood Casework
-
12 32 00 - Manufactured Wood Casework
-
12 36 00 - Countertops (Solid Surface/Laminate)
Key Differentiators
-
Schedule Certainty: Off-site fabrication reduces on-site trade interference by up to 30%.
-
2mm Precision Standard: Manufacturing tolerances that eliminate "field-fit" delays.
-
Velocity Installation: Pre-engineered, "plug-and-play" assemblies for rapid site integration.
-
Submittal Excellence: Ultra-fast RFI and shop drawing approvals via comprehensive CAD packages.
Corporate Data
CAGE Code : 9KVW9
UEI : J57YA8M2AM93
NAICS Codes: 337212 (Custom Architectural Woodwork), 238350 (Finish Carpentry)
Certifications: Fully Insured & Bondable, MBE, SBE, State of CT.
Service Area: METRO NEW YORK, CONNECTICUT, RHODE ISLAND, MASSACHUSETS
Our Workflow
-
Phase 1: Digital Coordination (We model the clash-free environment).
-
Phase 2: Off-Site Fabrication (We build in a controlled environment).
-
Phase 3: Velocity Install (We ship and fit with zero field-adjustments).
Technical Gallery
Our Clients







